Akron Public Schools

Press Box & Stadium Improvements

This project included upgrades to John R. Buchtel CLC Stadium, including a new press box and concessions/restroom building. The existing press box was demolished and replaced with a larger two-story facility. The 3,500 SF building features a concession stand and storage space on the first level. The second level includes a press box with seating for home and visitor coaches as well as a dedicated filming room.

The design team partnered with students from the Buchtel Construction & Masonry Career Academy to add some school spirit to the press box structure with the addition of decorative statues of the school’s mascot, a griffin. These decorative stone griffins flank the press box. As part of this collaboration, students assisted in constructing the griffins’ wings.

An additional building with restrooms and storage space was also constructed on the site.

As part of the project, additional improvements were incorporated to accommodate future upgrades. The existing track was resurfaced, and electrical service enhancements were completed, including the installation of conduit pathways to support future sports lighting locations.

Project Details

Client

Akron Public Schools

Location

Akron, Ohio

Category

Completion

2026

Size

3,500 Square Feet

Next Project

The University of Toledo

One-Stop Student Services Renovation & Addition